Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Deliverables for November 31st

  • Monitoring and data collection protocols developed for an additional 11 modules**

  • Data collection beta app(s) developed supporting 8 modules*

  • Data exchange standards specification developed and published compliant to 8 modules*

  • Draft controlled vocabularies for 8 modules*

  • Publishing and access methods established for the controlled vocabularies and ontology

  • IT systems built including API End stage report prepared

...

  • Remaining draft monitoring and data collection protocols delivered

    • Surveillance protocol team

  • Data exchange standard specification published online with draft examples for 8 modules

    • Investigate if we should use PoolParty or not.

    • Provide examples of how the data collected will look like in RDF conforming to the TERN Ontology

    • This is related to the export function Andrew’s team is implementing (Luke)

    • Outcome

      • the updated data exchange specification document

      • defined format and structure to share data collected from 8 modules in a site-survey data exchange standard

  • Vocabulary & ontology viewer set up for DAWE

    • Vocabulary viewer shows for the 8 modules:

      • Observable properties

      • Methods

        • Due to the short time constraint, we might need to just manually create these by hand like we have done for the AusPlots Rangelands and CORVEG methods

      • Categorical values

        • From Andrew’s LUT APIs

      • Feature types

      • Instrument types

      • Attributes

    • Ontology viewer shows the core classes and their constraints

  • All vocabs have a resolvable URI

    • We can use a test persistent ID as a demo since DAWE has not established a governance group to decide what the persistent identifier namespace is yet

  • Beta app(s) satisfies the data collection needs of 8 modules.

    • Andrew

  • Beta app(s) shows full functionality and feeds into a proxy database.

    • Andrew

  • IT infrastructure supports electronic data collection and management in a single system.

    • Andrew

  • End stage report satisfies the requirements at paragraph 6 of this Schedule.

    • Team

...